August 19, 2018 – Sierra Roadwork Schedule, Sunday through Saturday, August 19-25, 2018.
LONG-TERM PROJECTS
Interstate 80 (Placer County) from Long Ravine underpass to .2 miles east of Magra Road overcrossing: Roadwork continues for a $50.6 million project to construct 3 miles of additional truck climbing lane and other improvements to primarily eastbound I-80 east of Colfax, including widening the Cape Horn undercrossing bridge.
Interstate 80 (Placer County) at the Gold Run State Rest and Recovery Areas (SRRAs): The EB and WB rest areas will be closed from May 9 to September 30 to bring water delivery and waste water treatment systems into compliance with current State requirements. Construction of the new system, similar to other SRRA locations, will eliminate costs associated with septic tank systems and improve the potable water delivery system.
State Route 65 (Placer County) from the I-80 junction to one mile south of Pleasant Grove Blvd, including the on- and/or off-ramps at Stanford Ranch Road, Galleria Boulevard and Harding Boulevard: The project will add capacity alleviate traffic congestion on the interchange between Interstate 80 and State Highway 65 in Placer County as well as nearby interchanges. Lane and ramp closures should be anticipated. Visit www.8065interchange.org for current information.
SHORT-TERM PROJECTS
State Route 20 (Nevada County) from Placer County line to westbound 80 off to Eastbound 20: Motorist can expect one way traffic control from 8:30 a.m. to 4 p.m. Monday through Wednesday for ditch cleaning.
State Route 49 (Sierra County) at the Downie River: Motorists can expect a full highway closure from 11 a.m. to 3 p.m. Tuesday for a bridge inspection.
State Route 49 (Yuba/Sierra County) from Marysville Road to Sierra City: Motorists can expect one-way traffic control from 7 a.m. to 3:30 p.m. Monday, Wednesday and Thursday for miscellaneous work.
State Route 49 (Sierra County) from Sierraville Creek to Lemon Canyon/Campbell Hot Springs: Motorists can expect one-way traffic control from 6 a.m. to 4 p.m. Wednesday for drainage cleaning.
State Route 49 (Placer County) at Bell Road: Motorists can expect lane and right shoulder restrictions on local cross streets from 8 p.m. to 2 a.m. Thursday for utility work.
Interstate 80 (Nevada/Sierra/Placer County) from east of I-80/SR-174 separation in Placer County to the California/Nevada state line: Motorists can expect rolling lane and shoulder restrictions in various locations from 8 p.m. to 8 a.m. Sunday through Saturday for striping operations.
Interstate 80 (Nevada/Sierra/Placer County) from east of I-80/SR-174 separation in Placer County to the California/Nevada state line: Motorists can expect alternating full ramp closures (work will be done at throat of ramps, no ramp will be closed until previous one has reopened) from 6 p.m. to 10 a.m. Sunday through Friday for striping operations.
Interstate 80 (Placer County) from Carpenter Flat undercrossing to the Laing Road eastbound off-ramp: Motorist can expect alternating lane closures from 5 p.m. to 10 a.m. Monday night through Friday morning for bridge work.
Interstate 80 (Nevada/Placer County) from Truckee to Floriston: Motorists can expect restricts at various undercrossings from 5 p.m. to 10 a.m. Sunday through Friday for bridge work.
Interstate 80 (Nevada County) from Trout Creek Undercrossing to Farad Undercrossing: Motorists can expect alternating lane closures at various undercrossings from 10 p.m. to 6 a.m. Sunday through Friday for bridge work.
Interstate 80 (Placer County) from Heather Glen overcrossing to Illinoistown overcrossing: Motorists can expect right shoulder and #2 lane restrictions from 6 p.m. to 10 a.m. Sunday through Friday for drainage cleaning.
Interstate 80 (Nevada County) from Donner Lake undercrossing to Donner Summit Rest are: Westbound motorists can expect #1 of 3 lanes closed from 7 a.m. to 4 p.m. Monday and Tuesday for maintenance work.
Interstate 80 (Nevada County) from the Nevada County Line to South Yuba River: Eastbound motorists can expect #1 of 3 lanes closed from 7 a.m. to 4 p.m. Wednesday and Thursday for maintenance work.
Interstate 80 (Nevada County) at Westbound Donner Pass Inspection Facility (CHP Scales): Motorists can expect lane and median restrictions from 8 a.m. to 2 p.m. Wednesday for sign work.
Interstate 80 (Placer County) from Monte Vista Lane to Alta Road undercrossing: Motorists can expect alternating lane and shoulder closures from 6 a.m. to 6 p.m. Monday through Thursday for a paving operation.
Interstate 80 (Placer County) from Kingvale to the Nevada County line: Westbound motorists can expect the #1 lane closed from 6 a.m. to 6 p.m. Monday through Friday for guardrail work.
State Route 89 (Placer/Nevada County) from West River Street to the on/off ramps to Eastbound 80: Motorists can expect one way traffic control from 7 a.m. to 4 p.m. Tuesday for sign work.
State Route 89 (Nevada County) from Prosser Dam Road/Alder Drive to Donner Camp Picnic Area: Motorists can expect one way traffic control from 7 a.m. to 5 p.m. Tuesday for sign work.
State Route 89 (Nevada County) from Prosser Dam Road/Alder Drive to Donner Camp Picnic Area: Motorists can expect one way traffic control from 7 a.m. to 5 p.m. Monday for ditch cleaning.
State Route 89 (Sierra County) from Calpine Summit to Sulpher Creek Road: Motorists can expect one way traffic control from 6 a.m. to 4 p.m. Tuesday for drainage cleaning.
State Route 174 (Nevada County) at Orchard Springs Road: Motorists can expect one way traffic controls from 7 a.m. to 7 p.m. Monday through Friday for drainage work.
State Route 193 (Placer County) from Rainbow Valley Road to Newcastle Tunnel undercrossing: Motorists can expect one way traffic controls in various locations from 9 a.m. to 2:30 p.m. Tuesday through Wednesday for tree work.