LONG-TERM PROJECTS

State Route 49 (Placer County) from the I-80/SR 49 interchange to Dry Creek Road: Construction began June 17, 2019 on a $42.4 million project in Auburn. The project will rehabilitate existing pavement and drainage, improve operational features and upgrade pedestrian and bicycle facilities. No traffic-interfering work is scheduled this week.

State Route 49 (Nevada County) from Woodridge Drive to Linton Lane: Construction began July 27 on a $3.8 million safety improvement project on State Route 49 near Wolf Road and Combie Road. Caltrans is constructing a northbound and southbound acceleration lane and adding other safety and operational improvement elements. Work will primarily be performed along shoulders behind concrete barriers, with minimal impacts to traffic. Major work on the project is complete with final electrical work anticipated in January.

State Route 49 (Nevada County) from Auburn Road to Alta Sierra Drive: Vegetation work is beginning for a $4.3 million safety improvement project on State Route 49 near Round Valley Road and Quail Creek Drive. Caltrans is constructing a two-way left turn lane with an increased 8-foot-wide southbound shoulder. Major construction work is expected in spring 2021. This project is currently in winter suspension.

Interstate 80 (Placer/Nevada Counties) between Alta and Floriston: A $6.6 million structure maintenance project will replace polyester concrete overlays and joint seals on 11 bridges. The project will extend the life of the bridge decks by sealing them off to moisture and fix rutting in the concrete overlays caused by heavy freight and vehicle travel.

January 11 – January 14

Interstate 80 (Placer County) at Alta: Motorists may expect intermittent lane and shoulder closures from 6 a.m. to 6 p.m. Monday through Thursday for bridge work.

Interstate 80 (Placer County) at Blue Canyon: Eastbound motorists may expect intermittent lane and shoulder closures from 6 a.m. to 6 p.m. Monday through Thursday for bridge work.

Interstate 80 (Nevada County) from the Interstate 80/State Route 89 separation to the Interstate 80/State Route 89/State Route 267 separation: Motorists may expect intermittent lane and shoulder closures from 6 a.m. to 6 p.m. Monday through Thursday for bridge work.

Interstate 80 (Nevada County) from the Union Mills Bridge Overcrossing to the Hinton Road Overcrossing: Motorists may expect intermittent lane and shoulder closures from 6 a.m. to 6 p.m. Monday through Thursday for bridge work.

Interstate 80 (Nevada County) at Floriston: Motorists may expect intermittent lane and shoulder closures from 6 a.m. to 6 p.m. Monday through Thursday for bridge work.

Interstate 80 (Nevada County) at Floriston: Motorists may expect alternating full off-ramp closures from 9 a.m. to 4 p.m. Monday through Thursday for bridge work.

Interstate 80 (Nevada County) from Farad to the Acid Flat Bridge: An $12.9 million Farad Ditch Slope Stabilization project will restore the Farad Ditch by extending the collection area. Construction will also include regrading of the slope by means of roadway excavation, rock excavation, and controlled blasting.

January 11 – January 15

Interstate 80 (Nevada County) from Farad to the Acid Flat Bridge: Westbound motorists may expect intermittent lane and shoulder closures from 6 a.m. to 7 p.m. Monday through Thursday, and 6 a.m. to 3 p.m. Friday for roadway excavation.

State Route 174 (Nevada County) from Maple Way to You Bet Road: A $27.1 million safety improvement project will realign several curves, widen shoulders, add a southbound left turn pocket at Greenhorn Access Road and improve the clear recovery zone, allowing errant vehicles to regain control. This project is currently in winter suspension.

SHORT-TERM PROJECTS

State Route 20 (Nevada County) from the State Route 49/20 separation to Nevada Street: Westbound motorists may expect intermittent lane and shoulder closures from 5 a.m. to 7 p.m. Monday and Tuesday; eastbound motorists may expect intermittent lane and shoulder closures from 5 a.m. to 7 p.m. Wednesday and Thursday for drainage cleaning.

State Route 49 (Placer County) from Old Foresthill Road to Borland Street/Lincoln Way: Motorists may expect intermittent one-way traffic control and shoulder closures from 8:15 a.m. to 2:30 p.m. Monday through Thursday for guardrail repair.

State Route 49 (Placer County) from Roble Point Firebreak Trail to Borland Street/Lincoln Way: Motorists may expect intermittent one-way traffic control and shoulder closures from 7:30 a.m. to 4 p.m. Saturday for pavement repair.

State Route 49 (Placer County) from Fresh Air Lane to Lorenson Road/Florence Lane: Northbound motorists may expect a #2 lane and shoulder closure from 9 a.m. to noon Thursday for utility work.

State Route 49 (Placer County) from Lone Star Road to Rio Oso Road: Southbound motorists may expect a #2 lane and shoulder closure from 9 a.m. to noon Thursday for utility work.

State Route 49 (Sierra County) from the Rocky Rest Campground to Ladies Canyon: Motorists may expect intermittent right shoulder closures from 7 a.m. to 5:30 p.m. Monday through Friday for shoulder work.

Interstate 80 (Placer County) at Douglas Boulevard: Eastbound motorists may expect lane and shoulder closures from 9 p.m. to 5 a.m. Wednesday night through Friday morning for utility work.

State Route 49 (Sierra County) at Ladies Canyon: Motorists may expect one-way traffic control and shoulder closures from 6 a.m. to 6 p.m. Monday through Thursday for bridge work.

Interstate 80 (Sacramento/Placer Counties) from Madison Avenue to Cirby Way: Motorists may expect intermittent right shoulder closures from 7 a.m. to 3:30 p.m. Monday through Friday for electrical work.

Interstate 80 (Nevada County) from Soda Springs to Donner Pass Road in Truckee: Motorists may expect intermittent lane and shoulder closures from 9 a.m. to 4 p.m. Tuesday through Thursday for striping work.

State Route 89 (Nevada County) at Donner Pass Road: Motorists may expect lane and shoulder restrictions from 6 a.m. to 6 p.m. Monday through Thursday for bridge work.

State Route 267 (Placer County) from Northstar Drive to the Martis Creek culvert: Motorists may expect intermittent one-way traffic control and shoulder closures from 8 a.m. to 4 p.m. Wednesday and Thursday for a maintenance operation.