June 1, 2020 – Sierra Roadwork Schedule Sunday through Saturday, May 31, 2020 – June 6, 2020.

Please remember to stay home except for essential needs.

California is under a Stay-at-Home Order and only essential travel is permitted.

Learn more at covid19.ca.gov

#StayHomeSaveLives

LONG-TERM PROJECTS

State Route 49 (Placer County) from the I-80/SR 49 interchange to Dry Creek Road: Construction began June 17, 2019 on a $40.5 million project in Auburn. The project will rehabilitate existing pavement and drainage, improve operational features and upgrade pedestrian and bicycle facilities.

May 31 – June 5

State Route 49 (Placer County) from Nevada Street/Marguerite Mine Road to Bell Road: Motorists may expect intermittent lane and shoulder closures from 6 p.m. to 6 a.m. Sunday through Thursday for electrical work.

Interstate 80 (Placer County) from the I-80/SR-174 westbound on-ramp to Canyon Way: A $1.8 million Acceleration Lane project in Colfax will create a standard-length westbound acceleration and merge lane to increase the safety and operation of Interstate 80.

June 1 – June 5

Interstate 80 (Placer County) from the I-80/SR-174 westbound on-ramp to Canyon Way: Westbound motorists can expect intermittent lane, shoulder and on-ramp closures from 6 a.m. to 6 p.m. Monday through Friday for landscape work.

Interstate 80 (Nevada County) from Farad to Acid Flat Bridge: A $12.9 million Farad Ditch Slope Stabilization project will restore the Farad Ditch by extending the collection area. Construction will also include regrading of the slope by means of roadway excavation, rock excavation, and controlled blasting.

June 1 – June 5

Interstate 80 (Nevada County) from Farad to Acid Flat Bridge: Westbound motorists may expect intermittent lane and shoulder closures from 7 a.m. to 5 p.m. Monday through Thursday, and 7 a.m. to 4 p.m. Friday for roadway excavation.

SHORT-TERM PROJECTS

State Route 20 (Nevada County) from Zeibright Road to the Omega Rest Area: Motorists may expect intermittent, reversing one-way traffic control and shoulder closures from 8 a.m. to 6 p.m. Monday through Thursday for a crack seal operation.

State Route 49 (Nevada County) at Tadpole Creek Road: Northbound motorists can expect intermittent lane and shoulder closures from 7 p.m. Sunday to noon Monday for electrical work.

State Route 49 (Sierra County) from Old Gold Lake Road to the State Route 89 junction: Motorists may expect intermittent, reversing one-way traffic control and shoulder closures from 6 a.m. to 4 p.m. Monday through Thursday for a crack seal operation.

State Route 65 (Placer County) from the Interstate 80 junction to Levee Road: Northbound motorists may expect intermittent lane and shoulder closures from 8 p.m. to 4 a.m. Monday through Thursday for a striping operation.

State Route 65 (Placer County) at Blue Oaks Boulevard: Northbound motorists may expect a full off-ramp closure from 9 p.m. to 6 a.m. Monday through Tuesday for grinding and paving work.

State Route 65 (Placer County) at Twelve Bridges: Southbound motorists may expect a full on-ramp closure from 8 p.m. to 6 a.m. Tuesday through Wednesday for grinding and paving work.

Interstate 80 (Placer County) from Ophir Road to the Werner Road Overcrossing: Motorists may expect intermittent lane and shoulder closures from 8 p.m. to 6 a.m. Sunday through Thursday for electrical work.

Interstate 80 (Placer County) from Dry Creek Road to Bell Road: Motorists may expect intermittent lane and shoulder closures from midnight to 11 p.m. Monday through Friday for electrical work.

Interstate 80 (Placer County) from Rainbow to Cisco Grove: Westbound motorists may expect intermittent lane and shoulder closures from 9:30 a.m. to 4 p.m. Monday for bridge work.

State Route 89 (El Dorado/Placer Counties) from Eagle Falls Campground to Squaw Valley Road: Motorists may expect intermittent reversing, one-way traffic control and shoulder closures from 6 a.m. to 4 p.m. Monday, Wednesday and Thursday for tree and vegetation removal.

State Route 174 (Nevada County) from Race Street to Central Avenue: Southbound motorists may expect one-way traffic control from 7 a.m. to 4:30 p.m. Tuesday for utility work.

State Route 174 (Placer County) from Main Street to Bear River: Motorists may expect intermittent, one-way traffic control from 7 a.m. to 4:30 p.m. Monday for vegetation work.

State Route 193 (Placer County) from Sierra College Boulevard to Whittington Drive: Motorists may expect intermittent, reversing one-way traffic control and shoulder closures from 8 a.m. to 3 p.m. Monday through Friday for a crack seal operation.

State Route 267 (Nevada County) from Glenshire Drive to Schaffer Mill Road: Motorists may expect intermittent lane and shoulder closures from 7 a.m. to 5 p.m. Monday through Friday for pavement work.

State Route 267 (Nevada County) at Soaring Way: Motorists may expect lane and shoulder closures from 7 p.m. Monday to 6 a.m. Tuesday for electrical work.

State Route 267 (Placer County) from Mt. Watson Road to just past Martis Peak Road: Motorists may expect reversing, one-way traffic control and shoulder closures from 7 a.m. to 5 p.m. Monday through Thursday for guardrail repair.