May 7, 2017 – Sierra Roadwork Schedule, Sunday through Saturday, April 30-May 6, 2017.
LONG-TERM PROJECTS
Interstate 80 (Placer County) from Long Ravine underpass to .2 miles east of Magra Road overcrossing: Roadwork begins for the 2.5 year, $50.6 million project to construct @ 3 miles of additional ‘truck climbing lane’ and other improvements to primarily eastbound I-80 east of Colfax including widening the Cape Horn undercrossing bridge.
May 7-13
Interstate 80 (Placer County) from the Hwy 174/I-80 junction to the Secret Town overcrossing: Motorists can expect overnight right lane and shoulder closures from 8 p.m. to 11 a.m. Monday through Thursday May 8-11 and from 8 p.m. to 9 a.m. Friday May 12 for tree work.
Interstate 80 (Placer County) at the Cape Horn Undercrossing Bridge: Motorists can expect one way traffic controls for around-the-clock alternating lane closures from June 20 throughout the winter for bridge work.
Interstate 80/State Route 20 (Placer & Nevada Counties) from Magra to Kingvale (I-80) and Yuba Pass (I-80/Hwy 20 interchange) to Willow Valley on SR 20: Governor’s drought-related state of emergency declaration includes removal of dying, dead and hazardous trees damaged by bark beetle infestations and other drought-related causes. The projects will improve motorist safety, as well as reduce fuel for potential fires.
May 7-13
State Route 20 (Nevada County) from Harmony Ridge Road to junction Hwy 49 and Uren Street: Motorists can expect alternating one way traffic controls and lane and shoulder closures from 7 a.m. to 5 p.m. Monday through Friday May 8-12 for tree work.
Interstate 80 – Westbound (Placer County) from Drum Forebay overcrossing to Baxter overcrossing: A large mudslide in the area has been temporarily stabilized and slide removal/remediation activities will continue throughout the spring.
May 7-13
A long-term right shoulder closure will be in effect until May 30.
State Route 49 Slides/Slipouts (Nevada/Sierra Counties) at South Fork Yuba River Bridge to Star Lumber and Yuba/Sierra County line to Brandy City Road which will require remediation throughout the spring:
May 7-13
State Route 49 – Northbound (Sierra County) from Brandy City Road to Yuba/Sierra County line: Motorists can expect signalized one way traffic controls around the clock for slipout remediation activities.
State Route 49 (Nevada/Yuba County) from South Fork Yuba River Bridge to Star Lumber: Motorists can expect signalized/flagger one way traffic controls around the clock for slide removal activities.
SHORT-TERM PROJECTS
State Route 20 (Nevada County) from ½ mile east of Lowell Hill Road to Lowell Hill Road: Motorists can expect intermittent one way traffic controls and right shoulder closures from 6 a.m. to 9 p.m. Monday through Thursday May 8-11 and 6 a.m. to 3 p.m. Friday May 12 for utility work.
State Route 20 – Westbound (Nevada County) at the off ramp to Brunswick Road: Motorists can expect partial ramp closure from 7 a.m. to 5 p.m. Monday through Friday May 8-12 for tree work.
State Route 20 – Westbound (Nevada County) at the on and off ramps at the Gold Flat Road interchange: Motorists can expect partial ramp closure from 7 a.m. to 5 p.m. Monday through Friday May 8-12 for tree work.
State Route 49 (Yuba/Sierra Counties) from Marysville Road to Gold Lake/Greene Roads: Motorists can expect alternating lane closures and one way traffic controls from 7 a.m. to 3:30 p.m. Monday through Thursday May 8-11 for miscellaneous work.
State Route 49 (Sierra County) from Sattley junction to Yuba Pass Summit: Motorists can expect alternating lane closures and one way traffic controls from 7 a.m. to 4 p.m. Monday through Wednesday May 8-10 for shoulder work.
Interstate 80 – Westbound (Nevada County) from the Donner Park overcrossing to the beginning of the chain on area: Motorists can expect center lane, right lane and shoulder closures from 6 a.m. to 8 p.m. Monday through Thursday May 8-11 and 6 a.m. to 1 p.m. Friday May 12 for pavement repair.
Interstate 80 – Westbound (Nevada County) at the WB I-80 / Hwy 89 separator: Motorists can expect full connector ramp closure from 9 a.m. to 3 p.m. Tuesday May 9 for electrical work.
Interstate 80 – Westbound (Nevada County) from 2 miles west of Floriston to the Hinton Road undercrossing: Motorists can expect right lane and shoulder closures from 7 a.m. to 5 p.m. Monday through Thursday May 8-11 and from 7 a.m. to 1 p.m. Friday May 12 for slide removal.
Interstate 80 – Westbound (Nevada County) from the Castle Peak undercrossing to the Soda Springs overcrossing: Motorists can expect right lane and shoulder closures on Monday May 8 from 7:30 a.m. to 5 p.m. for k-rail removal.
Interstate 80 – Eastbound (Placer County) from Hallborn Road/Werner Road undercrossing to Nevada Street overcrossing: Motorists can expect right lane closure from 8 a.m. to 4 p.m. for maintenance operation.
Interstate 80 – Eastbound (Placer County) from Hallborn Road/Werner Road undercrossing to Nevada Street overcrossing: Motorists can expect full closure of the Maple Street off ramp on Tuesday May 9 from 9 a.m. to 1 p.m. for sign work.
Interstate 80 (Placer County) from Hallborn Road undercrossing (Werner Road) to the I-80/Hwy 193 junction: Motorists can expect intermittent freeway closures and right shoulder closures from 4 a.m. to 4 p.m. Sunday May 7 for utility work.
State Route 89 (Placer County) from Truckee River Bridge to Silver Creek Campground: Motorists can expect one way traffic controls from 6:30 a.m. to 5 p.m. Monday through Friday May 8-12 for emergency work.
State Route 89 (Placer County) from Goose Meadows Campground to Nevada County line: Motorists can expect intermittent one way traffic controls from 7 a.m. to 5 p.m. Tuesday and Wednesday May 9-10 for ditch cleaning.
State Route 193 (Placer County) from Gold Hill Road to Taylor Road: Motorists can expect one way traffic controls for right lane and shoulder closures from 7 a.m. to 6 p.m. Monday through Friday May 8-12 for utility work.