June 17, 2017 – Sierra Roadwork Schedule, Sunday through Saturday, June 18-24, 2017.

LONG-TERM PROJECTS

Interstate 80 (Placer County) from Long Ravine underpass to .2 miles east of Magra Road overcrossing: Roadwork begins for the 2.5 year, $50.6 million project to construct @ 3 miles of additional ‘truck climbing lane’ and other improvements to primarily eastbound I-80 east of Colfax including widening the Cape Horn undercrossing bridge.

June 18-24

Interstate 80 – Eastbound (Placer County) from the Hwy 174/I-80 junction to the Secret Town overcrossing:  Motorists can expect overnight right lane and shoulder closures from 8p.m. to 8 a.m. Sunday night through Friday morning June 18-23 for roadway excavation.

Interstate 80 (Placer County) at the Cape Horn Undercrossing Bridge:  Motorists can expect one way traffic controls for around-the-clock alternating lane closures for bridge work.

State Route 49 Slides/Slipouts (Nevada/Sierra Counties) at South Fork Yuba River Bridge to Star Lumber and Yuba/Sierra County line to Brandy City Road which will require remediation throughout the spring:

June 18-24

State Route 49 (Sierra County) from Brandy City Road to Yuba/Sierra County line:  Motorists can expect signalized one way traffic controls around the clock for slipout remediation activities.

State Route 49 (Nevada/Yuba County) from South Fork Yuba River Bridge to Star Lumber: Motorists can expect signalized/flagger one way traffic controls around the clock for slide removal activities.

Interstate 80 – Westbound Slides (Nevada County) and risk of slides, from stateline to Hirschdale Road will require remediation throughout the spring:

June 18-24

Interstate 80 – Westbound (Nevada County) k-rail will be placed around the clock to protect the right shoulder from post mile 25.5 to 26.0 for slide removal activities.

Interstate 80 – Westbound (Nevada County) from 2 miles west of Floriston to the Hinton Road undercrossing:  Motorists can expect overnight right lane and shoulder closures from 6 p.m. to 6 a.m. Monday through Friday June 19-23 for slide removal.

SHORT-TERM PROJECTS

State Route 20 (Nevada County) from ½ mile east of Lowell Hill Road to Lowell Hill Road: Motorists can expect intermittent one way traffic controls and right shoulder closures from 6 a.m. to 9 p.m. Monday through Thursday June 19-22 and 6 a.m. to 3 p.m. Friday June 23 for utility work.

State Route 20 (Nevada County) at Chalk Bluff Road: Motorists can expect intermittent one way traffic controls from 6 a.m. to 9 p.m. Monday through Thursday June 19-22 and 6 a.m. to 3 p.m. Friday June 23 for utility work.

State Route 49 (Sierra County) from Slate Range Road to Nevada Drive:  Motorists can expect alternating lane closures and one way traffic controls from 7 a.m. to 3:30 p.m. Monday through Thursday June 9-23 for ditch cleaning.

State Route 49 (Nevada County) from north Sidehill Viaduct to Yuba River Bridge: Motorists can expect alternating lane closures and one way traffic controls from 7 a.m. to 5 p.m. Monday through Friday June 19-23 for pavement grinding operations.

State Route 49 (Nevada County) from Carriage Road to Ladybird Drive: Motorists can expect right shoulder closures from 7 a.m. to 8 p.m. Monday & Tuesday June 19-20 for tree work.

State Route 49 (Sierra County) from the Plumas County line to Sierra City landfill:  Motorists can expect one way traffic controls from 6 a.m. to 4 p.m. Monday through Thursday June 19-22 for crack seal operations.

State Route 49 (Placer County) from JSO New Airport Road to Education Street:  Motorists can expect shoulder closures from 6 a.m. to 8 p.m. Monday through Friday June 19-23 for shoulder work.

State Route 49 (Placer County) from JSO New Airport Rd to Education Street:  Motorists can expect nightly right lane and shoulder closures from 10 p.m. to 7 a.m. Monday night through Saturday morning June 19-24 for landscape and shoulder work.

Interstate 80 (Placer County) from the Kingvale undercrossing to the Soda Springs overcrossing: Motorists can expect alternating lane and shoulder closures from 6 a.m. to 1 p.m. until Friday June 23 for drainage work.

Interstate 80 (Nevada County) from Prosser Village/Overland Trail undercrossing to Trout Creek undercrossing:  Motorists can expect one way traffic controls for right lane closures from Sunday night through Friday morning 8 p.m. to 7 a.m. June 18-23 for grinding operation.

Interstate 80 – Eastbound (Placer/Nevada Counties) at the Gold Run overcrossing: Motorists can expect full ramp closures from 7 a.m. to 6 p.m. Tuesday through Friday June 19-23 for roadway excavation.

Interstate 80 – Westbound (Placer County) from Gold Run overcrossing to Secret Town overcrossing from 8 a.m. to 4 p.m. Monday through Thursday June 19-21 for maintenance operations.

Interstate 80 – Westbound (Placer County) from the Nevada Street overcrossing to the Ophir Road undercrossing:  Motorists can expect right closures on local cross-street from 8 a.m. to 7 p.m. Monday through Thursday June 19-22 for utility work.

Interstate 80 – Westbound (Placer County) from Nevada County line to Carpenter Flat undercrossing: Motorists can expect alternating lane, shoulder and median closures from 7 a.m. to 5 p.m. Tuesday through Thursday June 20-22 for shoulder work.

Interstate 80 – Westbound (Placer County) from the Hampshire Rocks undercrossing to beginning of chain off area: Motorists can expect left lane closures from 10 a.m. to 4 p.m. Monday through Wednesday June 19-21 for median barrier work.

Interstate 80 – Westbound (Nevada County) from JWO the Hirschdale interchange to the Donner Park overcrossing: Motorists can expect alternating lane, shoulder, and median closures from 6 a.m. to 9 p.m. Monday through Thursday June 19-22 and 6 a.m. to 3 p.m. Friday June 23 for pavement repair.

Interstate 80 – Westbound (Nevada County) at the Hwy 89 South and I-80 junction: Motorists can expect overnight, full ramp closures from 11 p.m. to 6 a.m. Monday night and Tuesday night June 19 and 20 for pavement repair.

Interstate 80 – Westbound (Nevada County) at the westbound on-ramp from Central Truckee:  Motorists can expect full ramp closure from 11 p.m. Monday to 6 a.m. Tuesday June 19-20 for pavement repair.

Interstate 80 – Westbound (Nevada County) at the Donner Lake undercrossing: Motorists can expect full roadway closure on local cross street from 8 a.m. to 4 p.m. Sunday June 18 for bridge work.

State Route 89 (Placer/Nevada Counties) from Truckee River Bridge to Donner Pass Road:  Motorists can expect overnight one way traffic controls from 7 p.m. to 6 a.m. Sunday night through Friday morning June 18-23 for paving operations.

State Route 174 (Nevada County) from Empire Mine Road to Empire Mine Cross Road:  Motorists can expect one way traffic controls and right shoulder closures from 8 a.m. to 4 p.m. Monday through Thursday June 19-22 for tree work.

State Route 193 (Placer County) at Gold Hill Road:  Motorists can expect one way traffic controls for right lane and shoulder closures from 7 a.m. to 7 p.m. Monday through Friday June 19-23 for utility work.

State Route 267 (Placer County) from Brockway Summit to the junction with State Route 28 in Kings Beach: Motorists can expect one-way traffic control at various locations from 7 a.m. to 4:30 p.m. Tuesday through Thursday June 20-22 for crack sealing.